Netscape optimized 

Projects Approved for Funding at the Eigth Meeting of the ISTC Governing Board

13-14 December 1995

1. Approved Projects

36 Development of thermal protection systems for interplanetary flight. Project Manager: G.G.Chernyi, Research Institute of Mechanics (Moscow); Other Participating Russian Institutions: Joint Technology Development Center -JTDC (Moscow), Central Research Institute of Machine Building (Kaliningrad), Institute of Problem Mechanics (Moscow) Central Aerohydrodynamics Institute (Zhukovsky); Duration: 36 months; Funding Party: EU

128 Experimental investigation of transition of supersonic boundary layers relevant to high speed air transportation. Project Manager: A.A.Maslov, Institute of Theoretical & Applied Mechanics (Novosibirsk); Other Participating Russian Institutions: Scientific Research Institute of Technical Physics (Chelyabinsk-70); Duration: 36 months; Funding Party: US

216 Automatic Tunable CO2 - Laser. Project Manager: Yu.N.Bulkin, Scientific Research Institute of Experimental Physics (Arzamas-16); Duration: 18 months; Funding Party: EU

242 Automatic Television ANALYSER Development for Industrial Microstructure Control of the Fuel Tablets (ATLANT-TT). Project Manager: V.G.Nikitaev, Moscow Engineering Physics Institute (Moscow); Other Participating Russian Institutions: Bochvar Institute of Inorganic Materials (Moscow), Scientific Research and Design Institute of Mounting Technology (Moscow), Scientific Research Institute of Pulse Technique (Moscow); Duration: 36 months; Funding Party: EU

271 Investigation of Physico-Chemical Processes of Cleaning Evolved Industrial Gases From Sulphur and Nitrogen Oxides and Creating a Technical Base Method of the Radiation Cleaning Gas Flowers by Pulse- Repetitive Electron Beam. Project Manager: V.B.Bratchikov, Scientific Research Institute of Technical Physics (Chelyabinsk-70); Other Participating Russian Institutions: Institute of Electrophysics /Ural Division of RAS/ (Ekaterinburg), Integrated Iron & Steel Plant (Chelyabinsk); Duration: 24 months; Funding Party: US

291 Experimental Investigation of Spontaneous Nucleation upon Hydrogen Isotopes Condensation. Project Manager: V.M.Izgorodin, Scientific Research Institute of Experimental Physics (Arzamas-16); Duration: 14 months; Funding Parties: EU, US

317 Development the Methodology, Informational Support and Software for Risk analyses in Chemical-Engineering Installations. Project Manager: V.G.Gorsky, Scientific Research Institute of Organic Chemistry and Technology (Moscow); Duration: 36 months; Funding Party: EU

330 Development of Technology to Remove Transuranium Elements from Silt of Radioactive Storage Ponds. Project Manager: N.E.Shingarev, Bochvar Institute of Inorganic Materials (Moscow) Duration: 36 months; Funding Party: US

354 Development of Mass Production Technology of Lead Tungstate (PbWO2 ) Scintillation Crystals. Project Manager: A.N. Annenkov, Bogorodytsk Plant of Techno-Chemical Products (Bogoroditsk); Other Participating Institutions: Institute of Nuclear Problems (Belarus, Minsk), Institute for High Energy Physics (Protvino); Initial Foreign Collaborators: DAPNIA CEA (France), LAPP/IN2P3 (France), CERN (Switzerland); Duration: 24 months; Funding Party: EU; Additional Funding Source: CERN

358 The Role of the Kinetic Factors in Formation of Network Polymers and Related Materials. Project Manager: B.A.Rozenberg, Institute of Chemical Physics (Chernogolovka); Duration: 36 months; Funding Parties: EU, US

420 Development of the Technologies for Production of New Drug Delivery Systems. Project Manager: S.S.Avtushenko, Research Institute of Highly Pure Biopreparations (St Petersburg); Duration: 36 months; Funding Parties: EU, US

441 Technology of the New Generation Particle Detectors for Very High Radiation Fields. Project Manager: B.Dolgoshein, Moscow Engineering Physics Institute (Moscow); Other Participating Russian Institutions: Joint Institute for Nuclear Research (Dubna), Nuclear Physics Institute (Gatchina), Lebedev Institute of Physics (Moscow), Firm Mashinostroitel (Perm); Initial Foreign Collaborators: Max-Planck Institute für Physik (Germany), Rutherford Appleton Laboratory (UK), CERN (Switzerland), Department of Physics and Astronomy, University of Glasgow (UK); Duration: 36 months; Funding Party: EU; Additional Funding Source: CERN

B-23 mathematical simulation of natural and human activity accidents and their influence on environmental conditions and ecology. Project Manager: G.S.Romanov, Institute of Heat and Mass Transfer (Belarus, Minsk); Other Participating Russian Institutions: Belarusian State University (Belarus, Minsk), Moscow Engineering Physics Institute (Moscow); Duration: 36 months; Funding Party: US

G-25 Development of the universal method for control of heat-carrier leakage from liquid-metallic contours Project Manager: V.G. Kashia, Sukhumi Institute of Physics and Technology (Georgia, Tbilisi); Duration: 24 months; Funding Party: EU

K-48 The Development of the Technology for Decommissining of the Reactor Facility with Research Reactor RA of the Institute of Atomic Energy of the National Nuclear Center of the Republic of Kazakhstan. Project Manager: D.I.Zelenski, Institute of Atomic Energy of National Nuclear Center (Kurchatov); Duration: 24 months; Funding Party: US

2. Approved for Feasibility Study

314 VOLNA Project Manager: V.V.Dyachenko, Ioffe Physico-Technical Institute (St Petersburg); Other Participating Russian Institutions: Scientific Production Association "ISTOK-2" (Fryazino), Institute of High Power Radio-Construction (St Petersburg), Research Institute of Innovative and Thermonuclear Research (Troitsk); Funding Party: EU

385 Creation of the Permanent space patrol of solar EUV and X-ray radiation Project Manager: S.V.Avakyan, Vavilov State Optical Institute (St Petersburg); Other Participating Russian Institutions: Scientific research Institute of Complex Testing /of the Vavilov SOI/ (St Petersburg), Design Office "Arsenal" (St Petersburg), Institute of solar Terrestrial Physics (Irkutsk); Funding Party: EU

402 Construction of directed Action molecules on chosen classes of eucariotic cell. Project Manager: I.G.Shemyakin, State Research Institute of Applied Microbiology (Oblensk); Initial Foreign Collaborators: National Cancer Institute, Berthesde (US), Urologic & Oncologic Research Laboratory, N.Y. (US); Funding Parties: EU, US

423 Photoelectronic Devices for High-Energy Physics and Medical Tomography. Project Manager: B.Berkovsky, Scientific Research Institute of Pulse Technique (Moscow);Other Participating Russian Institutions: Institute for Theoretical and Experimental Physics (Moscow), Research Institute for Medical Engineering (Moscow), Research Center "Geosfera" (Moscow); Initial Foreign Collaborators: CERN (Switzerland), CTI PET Sistems, Inc. (US), Massachusetts Institute of Technology (US), University of Massachusetts (US); Funding Parties: EU, US

3. Supplemental Funding for Previously Approved Feasibility Study Project

101.2 Development of scientific and methodological basis for diagnostics and forecast of the state of Nuclear Waste at the bottom of the Barents and Kara Seas and the Sea of Japan. Identification of Ways to Prevent Dangerous Ecological Aftereffects. Project Manager: S.A.Lavkovsky, Central Design Bureau "Lazurit" (Nizhni Novgorod); Other Participating Russian Institutions: Research and Development Institute of Power Engineering (Moscow), Kurchatov Research Center (Moscow), Experimental Design Bureau of Machine Building (Nizhny Novgorod), Design Bureau Gidropress (Podolsk), Scientific Production Association 'Typhoon" (Obninsk); Duration: 24 months; Funding Parties: EU, Sweden

4. Continuation of Complete Project

G-10 (B) Development of Building Blocks based on gallium arsenide and related compounds for apparatus and systems. (Stage II) Project Manager: N.P.Khuchua, Research Production Complex Electron Technology /Tbilisi State University/ (Georgia, Tbilisi); Other Participating Institutions: Sukhumi Institute of Physics and Technology (Georgia, Tbilisi); Initial Foreign Collaborator: Fraunhofer Institut fuer Angewandtre Festkoerperphysik - IAF, (Germany); Duration: 18 months; Funding Party: EU
ISTC GB Statements ISTC homepage